Main Business

Heater Fabrication & Erection

  • CLIENT SK GAS / JNK HEATERS
  • SCOPE OF WORK FABRICATION & ERECTION OF REACTOR CHARGE HEATER
  • WORK VOLUME STEEL : 350TON / COIL WELDING : 6,000 DI
  • WORK PERIOD 2014. 06 ~ 2015. 02
  • RADIANT & CONVECTION MODULE TRANSPORTATION
  • RADIANT ERECTION
  • CONVECTION & STACK ERECTION
  • RADIANT COIL FABRICATION
  • RADIANT OUTLET MANIFOLD
  • CONVECTION COIL FABRICATION

TORE PROJECT (TURKMENBASHI, TURKMENISTAN)

  • CLIENTHYUNDAI ENGINEERING / JNK HEATERS
  • SCOPE OF WORKFABRICATION OF FIRED HEATERS
  • WORK VOLUMESTEEL : 300TON / COIL WELDING : 5,000 DI
  • WORK PERIOD2013. 08 ~ 2014. 02
  • RADIANT MODULING
  • RADIANT MODULING - CERAMIC & COIL WELDING
  • RADIANT COIL FABRICATION
  • CONVECTION MODULE HYDRO. TEST

NEEDLE COKE PROJECT (POSCO, KOREA)

  • CLIENTPOSCO ENGINEERING / JNK HEATERS
  • SCOPE OF WORKFABRICATION OF 3 FIRED HEATERS
  • WORK VOLUMESTEEL : 250TON / COIL WELDING : 4,000 DI
  • WORK PERIOD2013. 10 ~ 2014. 02
  • RADIANT MODULING
  • RADIANT COIL FABRICATION
  • STACK TRANSPORTATION
  • RADIANT MODULE TRANSPORTATION

HEATER FABRICATION & ERECTION

  • NEW PX PROJECT / SK INNOVATION, 2013¡¯
    (8 Cylindrical Heaters with APH System)
  • H PROJECT / SK INNOVATION, 2013¡¯
    (2 Cylindrical Heaters)
  • H PROJECT / SK INNOVATION, 2013¡¯
    (4 Cylindrical Heaters)
  • STC A2 PROJECT / SAMSUNG TOTAL, 2013¡¯
    (5 Cylindrical Heaters with APH System)
  • STC A2 PROJECT / SAMSUNG TOTAL, 2013¡¯
    (5 Cylindrical Heaters with APH System)
  • STC A2 PROJECT / SAMSUNG TOTAL, 2013¡¯
    (5 Cylindrical Heaters with APH System)

HEATER MODULING WORK

  • HEATER MODULING WORK
  • HEATER MODULING WORK
  • HEATER MODULING WORK
  • HEATER MODULING WORK

REVAMPING & MAINTENANCE

  • Heater Conv. Module ETS Replacement
  • Heater Conv. Module Coil Replacement
  • Radiant Coil Replacement
  • Burner Replacement

REFRACTORY LINING

  • REFRACTORY LINING
  • REFRACTORY LINING
  • REFRACTORY LINING
  • REFRACTORY LINING

DECOMPOSITION REFRACTORY

  • DECOMPOSITION FURNACE
    REPRACTORY LINING / SK Energy
  • DECOMPOSITION FURNACE
    REPRACTORY LINING / SK Energy
  • DECOMPOSITION FURNACE
    REPRACTORY LINING / SK Energy
  • DECOMPOSITION FURNACE
    REPRACTORY LINING / SK Energy
  • DECOMPOSITION FURNACE
    REPRACTORY LINING / SK Energy
  • DECOMPOSITION FURNACE
    REPRACTORY LINING / SK Energy
  • DECOMPOSITION FURNACE
    REPRACTORY LINING / SK Energy

THERMAL REACTOR REFRACTORY WORK

  • THERMAL REACTOR
    REPRACTORY LINING/S-OIL
  • THERMAL REACTOR
    REFRACTORY WORK
  • THERMAL REACTOR
    REFRACTORY WORK
  • THERMAL REACTOR
    REFRACTORY WORK
Project Location Item No. Item Name Remark
SK Energy SA-H5902 Decompostion Furnace New
SK Energy SR-H4511 Thermal Reactor New
SK Energy SR-H4611 Thermal Reactor New
SK Energy SA-H3502R Thermal Reactor New
SK Energy SB-H3502R Thermal Reactor New
SK Energy SR-H6101 Thermal Reactor T/A work
SK Energy SR-H6301 Thermal Reactor T/A work

RAMMING WORK

  • HEXAGON MESH INSTALLATION
  • HEXAGON MESH INSTALLATION
  • HEXAGON MESH INSTALLATION
  • HEXAGON MESH INSTALLATION
  • PLASTIC CASTABLE RAMMING
  • PLASTIC CASTABLE RAMMING
  • PLASTIC CASTABLE RAMMING
  • PLASTIC CASTABLE RAMMING

REFRACTORY DRY-OUT

  • DRY OUT FOR THERMAL
    REACTOR REFRACTORY LINING
  • DRY OUT FOR THERMAL
    REACTOR REFRACTORY LINING
  • DRY OUT FOR THERMAL
    REACTOR REFRACTORY LINING
  • DRY OUT FOR THERMAL
    REACTOR REFRACTORY LINING

INCINERATOR REFRACTORY WORK

REFRACTORY WORK

  • BRIDGEWALL INSTALLATION
  • BOOTSEAL INSTALLATION
  • CASTABLE GUNNING WORK
  • CERAMIC FIBER BLANKET INSTALL
  • BURNER TILE INSTALLATION WORK
  • BURNER TILE INSTALLATION WORK
  • BURNER TILE INSTALLATION WORK
  • BURNER TILE INSTALLATION WORK

MAINTENANCE & REVAMP WORK

  • Scaffold Installation
  • New Heater Installation Revamping
  • Emergency Work
  • CCR Heater Tube Revamping

DETAIL CONSTRUCTION PROCEDURE

  • 1. Chipping & Padding
  • 2. Radiant Floor Installation
  • 3. Radiant Side Wall Installation
  • 4. Radiant Side Wall Bolting
  • 5. Scaffolding in Radiant Inside
  • 6. Safety Net Installation in Radiant Inside
  • 7. Ceramic Blanket Lining
  • 8. Radiant Coil Installation
  • 9. Radiant Coil Installation
  • 10. Radiant Roof erection
  • 11. Convection Module erection
  • 12. Stack 1st step erection
  • 13. Stack Base Bolting
  • 14. Stack 2nd step installation
  • 15. Stack 2nd step Bolting
  • 16. Cross Over Installation
  • 17. Pneumatic Test
  • 18. Burner Erection

STORAGE TANK : QAFCO-5 PROJECT PKG¡¯ 7

  • Owner & ContractorAl-Rashid Trad. & Contr. Co. / Hamchang Contr. Est.
  • Contract AmountUSD 10 Mil
  • LocationJeddah, Saudi Arabia
  • Construction PeriodMay 09 ~ Dec 10
  • WORK VOLUMEPiping Work : 600 Ton / Steel Structure : 2,900 Ton / Equipment Erection : 3,400 Ton

WATER STPRAGE TANK : Briman Water Tank Project

  • Owner & ContractorQAFCO / Hyundai Eng. & Const. Co.
  • Contract AmountUSD 10 Mil
  • LocationDoha, Qatar
  • Construction PeriodJun 08 ~ Sep 09
  • WORK VOLUME140,000 §© x 4 units / ID 98m x H 20.0m
  • Jeddah Briman
  • Jeddah Briman
  • Jeddah Briman
  • Jeddah Briman
  • Jeddah Briman

DETAIL CONSTRUCTION PROCEDURE (WATER TANK)

  • Internal Painting
  • Scaffolding
  • Cleaning
  • External Painting