Heater Fabrication & Erection
- CLIENT SK GAS / JNK HEATERS
- SCOPE OF WORK FABRICATION & ERECTION OF REACTOR CHARGE HEATER
- WORK VOLUME STEEL : 350TON / COIL WELDING : 6,000 DI
- WORK PERIOD 2014. 06 ~ 2015. 02
- RADIANT & CONVECTION MODULE TRANSPORTATION
- RADIANT ERECTION
- CONVECTION & STACK ERECTION
- RADIANT COIL FABRICATION
- RADIANT OUTLET MANIFOLD
- CONVECTION COIL FABRICATION
TORE PROJECT (TURKMENBASHI, TURKMENISTAN)
- CLIENTHYUNDAI ENGINEERING / JNK HEATERS
- SCOPE OF WORKFABRICATION OF FIRED HEATERS
- WORK VOLUMESTEEL : 300TON / COIL WELDING : 5,000 DI
- WORK PERIOD2013. 08 ~ 2014. 02
- RADIANT MODULING
- RADIANT MODULING - CERAMIC & COIL WELDING
- RADIANT COIL FABRICATION
- CONVECTION MODULE HYDRO. TEST
NEEDLE COKE PROJECT (POSCO, KOREA)
- CLIENTPOSCO ENGINEERING / JNK HEATERS
- SCOPE OF WORKFABRICATION OF 3 FIRED HEATERS
- WORK VOLUMESTEEL : 250TON / COIL WELDING : 4,000 DI
- WORK PERIOD2013. 10 ~ 2014. 02
- RADIANT MODULING
- RADIANT COIL FABRICATION
- STACK TRANSPORTATION
- RADIANT MODULE TRANSPORTATION
HEATER FABRICATION & ERECTION
- NEW PX PROJECT / SK INNOVATION, 2013¡¯
(8 Cylindrical Heaters with APH System)
- H PROJECT / SK INNOVATION, 2013¡¯
(2 Cylindrical Heaters)
- H PROJECT / SK INNOVATION, 2013¡¯
(4 Cylindrical Heaters)
- STC A2 PROJECT / SAMSUNG TOTAL, 2013¡¯
(5 Cylindrical Heaters with APH System)
- STC A2 PROJECT / SAMSUNG TOTAL, 2013¡¯
(5 Cylindrical Heaters with APH System)
- STC A2 PROJECT / SAMSUNG TOTAL, 2013¡¯
(5 Cylindrical Heaters with APH System)
HEATER MODULING WORK
- HEATER MODULING WORK
- HEATER MODULING WORK
- HEATER MODULING WORK
- HEATER MODULING WORK
REVAMPING & MAINTENANCE
- Heater Conv. Module ETS Replacement
- Heater Conv. Module Coil Replacement
- Radiant Coil Replacement
- Burner Replacement
REFRACTORY LINING
- REFRACTORY LINING
- REFRACTORY LINING
- REFRACTORY LINING
- REFRACTORY LINING
DECOMPOSITION REFRACTORY
- DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
- DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
- DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
- DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
- DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
- DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
- DECOMPOSITION FURNACE
REPRACTORY LINING / SK Energy
THERMAL REACTOR REFRACTORY WORK
- THERMAL REACTOR
REPRACTORY LINING/S-OIL
- THERMAL REACTOR
REFRACTORY WORK
- THERMAL REACTOR
REFRACTORY WORK
- THERMAL REACTOR
REFRACTORY WORK
Project Location |
Item No. |
Item Name |
Remark |
SK Energy |
SA-H5902 |
Decompostion Furnace |
New |
SK Energy |
SR-H4511 |
Thermal Reactor |
New |
SK Energy |
SR-H4611 |
Thermal Reactor |
New |
SK Energy |
SA-H3502R |
Thermal Reactor |
New |
SK Energy |
SB-H3502R |
Thermal Reactor |
New |
SK Energy |
SR-H6101 |
Thermal Reactor |
T/A work |
SK Energy |
SR-H6301 |
Thermal Reactor |
T/A work |
RAMMING WORK
- HEXAGON MESH INSTALLATION
- HEXAGON MESH INSTALLATION
- HEXAGON MESH INSTALLATION
- HEXAGON MESH INSTALLATION
- PLASTIC CASTABLE RAMMING
- PLASTIC CASTABLE RAMMING
- PLASTIC CASTABLE RAMMING
- PLASTIC CASTABLE RAMMING
REFRACTORY DRY-OUT
- DRY OUT FOR THERMAL
REACTOR REFRACTORY LINING
- DRY OUT FOR THERMAL
REACTOR REFRACTORY LINING
- DRY OUT FOR THERMAL
REACTOR REFRACTORY LINING
- DRY OUT FOR THERMAL
REACTOR REFRACTORY LINING
INCINERATOR REFRACTORY WORK
REFRACTORY WORK
- BRIDGEWALL INSTALLATION
- BOOTSEAL INSTALLATION
- CASTABLE GUNNING WORK
- CERAMIC FIBER BLANKET INSTALL
- BURNER TILE INSTALLATION WORK
- BURNER TILE INSTALLATION WORK
- BURNER TILE INSTALLATION WORK
- BURNER TILE INSTALLATION WORK
MAINTENANCE & REVAMP WORK
- Scaffold Installation
- New Heater Installation Revamping
- Emergency Work
- CCR Heater Tube Revamping
DETAIL CONSTRUCTION PROCEDURE
- 1. Chipping & Padding
- 2. Radiant Floor Installation
- 3. Radiant Side Wall Installation
- 4. Radiant Side Wall Bolting
- 5. Scaffolding in Radiant Inside
- 6. Safety Net Installation in Radiant Inside
- 7. Ceramic Blanket Lining
- 8. Radiant Coil Installation
- 9. Radiant Coil Installation
- 10. Radiant Roof erection
- 11. Convection Module erection
- 12. Stack 1st step erection
- 13. Stack Base Bolting
- 14. Stack 2nd step installation
- 15. Stack 2nd step Bolting
- 16. Cross Over Installation
- 17. Pneumatic Test
- 18. Burner Erection
STORAGE TANK : QAFCO-5 PROJECT PKG¡¯ 7
- Owner & ContractorAl-Rashid Trad. & Contr. Co. / Hamchang Contr. Est.
- Contract AmountUSD 10 Mil
- LocationJeddah, Saudi Arabia
- Construction PeriodMay 09 ~ Dec 10
- WORK VOLUMEPiping Work : 600 Ton / Steel Structure : 2,900 Ton / Equipment Erection : 3,400 Ton
WATER STPRAGE TANK : Briman Water Tank Project
- Owner & ContractorQAFCO / Hyundai Eng. & Const. Co.
- Contract AmountUSD 10 Mil
- LocationDoha, Qatar
- Construction PeriodJun 08 ~ Sep 09
- WORK VOLUME140,000 §© x 4 units / ID 98m x H 20.0m
- Jeddah Briman
- Jeddah Briman
- Jeddah Briman
- Jeddah Briman
- Jeddah Briman
DETAIL CONSTRUCTION PROCEDURE (WATER TANK)
- Internal Painting
- Scaffolding
- Cleaning
- External Painting